Shipping article(s)
Rating
SINGAPORE SELECTS VESSEL CHARGING CONCEPTS FOR ELECTRIC HARBOUR CRAFT TRIAL
January 10, 2024

The Maritime and Port Authority of Singapore (MPA) announced that it had selected the Pyxis Energy Pte Ltd, Pyxis Maritime Pte Ltd and SP Mobility Pte Ltd partnership, Seatrium O&G (International) Pte Ltd, and Yinson Electric Pte Ltd, for their vessel charging concepts to be piloted in Singapore.

 

The proposal by Pyxis and SP Mobility will be deployed at Marina South Pier, while MPA will work with Seatrium and Yinson to further develop their concepts prior to testing.

 

In a statement, MPA the selection follows its call for proposal (CFP) on August 29 to develop, operate, and maintain e-HC charging points in Singapore.

 

At the close of the CFP1 on October 19, MPA said it received 12 proposals from companies and consortiums for the two-year pilot, which includes an option to extend for another year.

 

Pyxis Energy Pte Ltd, Pyxis Maritime Pte Ltd, and SP Mobility Pte Ltd partnership's proposed concept is based on Direct Current (DC) charging and was selected for the viability of the proposed price charging model and their experience and good track record of implementing charging points for electric vehicles.

 

Their proposed charging point for this CFP also complies with the national electric vehicle charging standard set by Technical Reference 25:2022, which was used as a proxy for this CFP while MPA was developing the national standards for charging infrastructure for e-HC.

 

MPA noted that the partnership also plans to operate its fleet of e-HCs at Marina South Pier, and these e-HCs will serve as the base offtake to ensure optimisation of the charging infrastructure and enable comprehensive data to be gathered during the pilot.

 

The pilot is planned from March 2024 to March 2026, with an option to extend by another year to March 2027.

 

"Pending the pilot's outcome and findings, the concept could be applied to other sites to support e-HC operations in the Port of Singapore," MPA said. It added that  Insights from the data collected will also contribute towards the development of a national e-HC charging infrastructure masterplan, implementation plan, and also the 1 The CFP follows from an Expression of Interest launched in July 2023 for proposals to design and promote adoption of full-e-HC in Singapore.

 

In addition, MPA has also assessed the potential of the innovative mobile charging concept proposed by Seatrium O&G (International) Pte Ltd and a high power (350-450kW) DC Charger proposed by Yinson Electric Pte Ltd — and will continue working with the two companies to further develop their proposals for future applications in Singapore through R&D collaboration.

 

"From 2030, all new harbour craft operating in the Port of Singapore will have to be fully electric, be capable of using B100 biofuel, or be compatible with net zero fuels such as hydrogen," MPA said.

 

It also plans to progressively roll out the charging infrastructure for e-HC operations in Singapore from 2025.

Verification Code: